General Safety Notes
Ensure that all necessary components and safety equipment are
available and operational.
Inspect the tower components for signs of damage or incorrect
functioning prior to use. Damaged or incorrect components must not
be used. Castors and adjustable legs should be periodically lubricated
to keep them free running.
Erect Exclusion zone and t Warning Signs to comply with Schedule 3
Part 2 (11), Work at Height Regulations 2005.
Ensure the scaffolding is to be erected on suitable foundations capable
of withstanding the loads imposed by the scaffolding (Schedule 3
Part 1(2) of Work at Height Regulations 2005) and, where appropriate,
adequate sole boards to be provided.
It is recommended that at least two people erect and dismantle the
tower.
BETA mobile aluminium towers MUST ALWAYS be climbed from the
inside, climbing the ladders only.
When lifting components or materials, always use reliable lifting
material and tying methods to ensure there is no possibility of the tower
overturning. Always lift from within the tower base.
Mobile access towers must only be moved manually, by pushing at the
base.
Ensure that the platforms are free of persons and equipment and that
brake locks are off prior to movement. Beware of soft or uneven ground
and overhead obstructions.
The tower height must be reduced to 4m high and stabilisers raised
approx 25mm clear of the ground. On completing the move apply all
brakes and check adjustment and stability prior to completion of tower
to full assembled height.
Note Tower height must be reduced to 2m high prior to any moves if
less than 4 stabilisers are used.
Always inspect the tower after moving and before use.
Always beware of live electrical apparatus, cables or moving parts of
machinery.
Care should be taken when using power tools, wash jets or other tools
that cause lateral force.
The maximum lateral force on a freestanding tower at platform level is
20kg.
DO NOT use boxes, ladders or other such means to gain additional
height.
Never bridge between a tower and a building unless designed to a
specication and approved.
Never jump onto platforms.
Do not use hoisting arrangements on a mobile access tower.
Fit side guardrails at all platforms.
Fit toeboards
on all working platforms.
Fit intermediate rest platforms at 4m intervals (maximum
).
DO NOT ax sheeting of any type to the tower.