Beta 450 User Manual Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
18
18
Assembly Procedure 1450 Tower - 3T
Descend to platform level below and
remove top platform
Remove diagonal brace xed to
upper frames.
Remove upper frames.
3.
4.
5.
Repeat steps 1 to 5 until dismantle process
is complete.
TRAINING
These instructions do not take the place of proper training. Consult your
supplier for details of specic training courses for users of mobile access
towers.
TOEBOARDS
Whichever position the working
platform is assembled toeboards
must be tted.
Position toeboard clips facing
each other and lock
in position over rung
by rmly pushing
down.
Toeboard clip
will automatically
engage when pushed
down (as shown).
Fit appropriate size of
toeboard into slots on
toeboard clips.
Fit toeboard clip
at opposite end of
return toeboard and
t appropriate size of
toeboard into clip slots.
Repeat this process until entire working platform has toeboard protection.
Return
Toeboard
Page view 17
1 2 ... 13 14 15 16 17 18 19 20

Comments to this Manuals

No comments